November 19, 2026
Memorial Park sits at 150 Crawford Boulevard. It covers 17 acres, with ten lighted tennis courts, two lighted baseball and softball fields, two lighted football and soccer fields, a lighted basketball and volleyball court, shuffleboard, a skate park, a playground, picnic tables and restrooms, according to the City of Boca Raton's parks and facilities inventory. Most people who live downtown have passed it many times without thinking of it as one place. City Hall, the Community Center and the Boca Raton Tennis Center all share the same block, and for the next several months that whole block is open for redesign.
On November 2, 2026, the city announced a six-month, community-driven master plan for Memorial Park and the Downtown Civic Area. Its announcement says plainly that "no final design, park layout, or Master Plan has been approved." The useful point for residents is that the plan has no drawing yet. The first ideas came from residents at a listening session on November 14, and those ideas leaned toward keeping what the park already has and making it easier to use.
The city hired Chen Moore & Associates to run the process. That firm will look at existing conditions, recreation and open space, the veterans memorials, pedestrian connections and community needs. According to Boca Post's coverage of the September contract, the 17-acre scope takes in Memorial Park, City Hall, the Community Center, the Tennis Center, the Singing Pines building complex and the public spaces around them.
The facilities on that land have names. The Boca Raton Tribune has identified the skate park as Tim Huxhold Skate Park and the tennis courts as the Boca Raton Tennis Center, which it reported in 2025 as ten clay courts. The same article describes the softball fields as having hitting stations. Singing Pines is the 1913 building that once housed the Children's Museum.
Since City Hall and the Community Center are inside the study area, the plan covers more than recreation. After the spring election, the city said it would replace City Hall and the Community Center itself rather than through an outside development partner. Where those buildings sit in relation to the fields, courts and trees is one of the questions this master plan will work through.
The word "Memorial" has a specific origin. The town dedicated the park in 1947 to honor World War II service members, as the Boca Raton Tribune reported when a plaque was unveiled this past May. In a Tribune progress report, SaveBoca cited town minutes from April 28, 1947 that dedicated the park to World War II and funded its original ballfield. The same report notes that the Teen Center keeps the west rock wall of a 1951 Boy Scout Hut.
The park's first ballfield was part of the same 1947 decision. Boca Raton's wartime history as an Army Air Field base runs through much of the city, and this is one of the few public places where it is part of the record. At a public meeting in 2025, WFLX reported that representatives of American Legion Post 277 and a Vietnam veteran asked the city to preserve the park's World War II heritage. The master plan names veterans memorials as one of its review areas.
The first of three November listening sessions took place on Saturday, November 14, at the Boca Raton Community Center. The Boca Raton Tribune's account says Chen Moore staff handed out aerial maps of the study area and split attendees into six groups of at least eight people. Each group answered three questions: what they like about the park and want preserved, what its challenges are, and what they would change over five, ten or more years.
The groups' suggestions overlapped heavily. They asked for shaded seating, a walking and biking trail around the perimeter, restrooms and an indoor fieldhouse. They wanted to keep the banyan trees, the open green space and Singing Pines. The Tribune reported that every group wanted tennis courts, that no group wanted pickleball, and that all of them asked for more prominent signage honoring military veterans and Boca's World War II history as an Army Air Field base.
That list reflects one afternoon and one room. The Tribune described the attendees as longtime residents who largely agreed with each other. The suggestions are still a starting point the consultant now has on paper. Most of them build on the park's current layout. A shaded loop around the perimeter, more seating under the banyans and better veterans signage would all change how the park is used without moving the fields or courts.
The open-ended format follows the March 10, 2026 vote. On that day, voters rejected the Terra/Frisbie "One Boca" proposal for the downtown campus, 14,122 to 4,832 according to the tally The Coastal Star attributed to the Supervisor of Elections. One Boca had proposed moving the softball fields, playground, skate park and Tennis Center. That proposal is no longer active, so anyone still picturing those relocations is working from an old map.
The new process asks about the whole park from the start. "Memorial Park is a place many of us have enjoyed over the years, and we want to hear the ideas and perspectives of our community as we shape a space that will bring people together for generations to come," Mayor Andy Thomson said in the city's announcement. The Tribune reported that the Chen Moore planner leading the session described the firm's approach as "listen first, design second."
The November listening sessions ended with a virtual session on the evening of Thursday, November 19. Two more ways to take part remain.
The first is the online survey, in English and Spanish, which you can reach from the city's Memorial Park page. The city says feedback from the survey, the sessions, stakeholder meetings and community events will shape the recommendations that go to City Council. If you never sat in on a session, the survey is the simplest way to get your ideas in front of the consultant.
The second is the public design charrette at The Studio at Mizner Park, the stage where ideas start becoming layouts. It opens with an introduction on Thursday, December 10, from 5 to 8 p.m., followed by charrette sessions on Friday, December 11, from 10 a.m. to 6 p.m., and Saturday, December 12, from 9 a.m. to 5 p.m. All of it is open to the public. If you have opinions about the clay courts, the shade under the banyans, the route from the Community Center to the fields, or how the 1947 dedication is marked, the charrette is where they can go onto a drawing.
For questions, the city lists [email protected].
According to the Tribune's account of the November 14 session, the four-phase process began in September and includes more stakeholder meetings. It is scheduled to end with a final report and proposed master plan for City Council in March. Boca Post reported that the consultant's schedule calls for that report to include two refined concepts with cost estimates by the end of March. That means residents should see the outcome of the December sketches within about three months.
A separate item will be on the ballot at the same time. On October 27, City Council voted 4 to 0 to put a $125 million general obligation bond for police facilities on the March 9, 2027 ballot. According to Boca Post, the proposal includes a replacement headquarters and a dedicated downtown police facility. That question is not part of the park plan, but it falls in the same month the Memorial Park concepts are expected to reach Council. Downtown residents will be following both.
You can learn more about the downtown blocks around the civic campus on our Boca Raton neighborhood page. If you own near Crawford Boulevard or Palmetto Park Road and want to talk through what a refreshed Memorial Park could mean for your street once the concepts are public in March, Deborah Puleo and the Fosters Realty team are glad to schedule a consultation and follow the plan with you.
Have questions about buying, selling, or moving to Palm Beach Gardens? Reach out anytime—Deborah is here to help with honest advice and local expertise.