Fosters Realty
White stucco home entrance with a sheltered pale oak door, charcoal-framed window, concrete terrace and sculptural sea grape planting.

Delray Beach's City Golf Course Is Coming Back as Two Courses From Two Eras

October 22, 2026

Behind the fencing on Highland Avenue, about 25 acres of bright white sand have been shaped into scoured, windswept hollows between the holes. Bahiagrass that is usually grown as pasture has been planted to frame the fairways. The architect's term for that sand is "sugar sand." When the Delray Beach Golf Club reopens, those sandy waste areas will be the first thing a returning golfer notices. They are also the plainest evidence that this is not the course that closed.

The city's course stopped taking golfers on November 3, 2025, according to the Palm Beach Post. The course coming back is better described as a new design than a restoration. Two architects working 25 years apart each get their own nine, rebuilt from a 1925 routing plan and a 1953 aerial photograph, because almost nothing from either man was left on the ground. Golfers will also be the ones paying for it, which is why the open questions about the reopening date and the rates matter more than they usually would.

Almost nothing from Ross or Wilson was left to restore

The course has passed through more hands than most people who played it before 2025 would guess. Golf Course Industry's October 2026 feature on the project gives this sequence:

  1. 1924: Donald Ross gets the Delray Beach commission. His Gulf Stream Golf Club had already opened in town in 1921.
  2. 1926: The first city-owned nine opens. The planned second nine never gets built, mostly because of the Great Depression.
  3. The lean years: Dick Wilson works at the course as golf pro and greenkeeper.
  4. 1950: After World War II, Wilson's own nine opens north of the clubhouse. It was one of his first solo designs.
  5. 1962 onward: Red Lawrence expands the property to 27 holes. The Robert Bruce Harris family then buys it and remakes all three nines.
  6. 1979: The city buys the course back. Two years later the Lawrence nine is sold to commercial developers.
  7. 1990s: Karl Litton renovates the remaining 18.
  8. December 2025: Construction on the current redesign begins.

By the time crews broke ground, the architects agreed there were no Ross or Wilson features left to save. The routing had been through decades of municipal play, several renovations and hurricanes. The redesign comes from John Sanford and David Ferris of Sanford Ferris Golf Design, a Jupiter firm. NMP Construction Corp. is building it. Golf Course Industry calls the result the only 18 holes known to combine original work by both Ross and Wilson.

The research behind the redesign is unusually specific. Ross drew a routing plan for Delray Beach, and his surviving site notes shaped the holes south of the clubhouse. Wilson left no plans at all. For his side, the team worked from 1953 aerial photography showing how much sand he had left exposed between holes.

The designers kept the two nines distinct

The usual approach with a classic course is to restore one architect's style across all 18 holes. Sanford and Ferris built one nine entirely in Ross's style and the other entirely in Wilson's. On the course, that looks like this:

Ross nine Wilson nine
Location South of the clubhouse North of the clubhouse
Bunkers Low sand lines, flat bunker floors, grass faces Large clusters with irregular edges and flashed sand
Signature hole Volcano-style par-3 8th, played across the canal Par-5 1st, where bunker clusters frame the landing areas and green
Setting A canal runs north to south through the middle, with its banks cleared of exotic vegetation More open space and the larger sandy waste areas

Ferris described the Wilson bunkers to Golf Course Industry as "a road map to the golf holes." He explained that Wilson often built in Florida on flat ground with little vegetation, so he used bunker complexes to give holes their shape. The 8th is the hole Sanford remembers best. He grew up playing high school and junior golf at the course in the 1970s, and he told the magazine:

"These were very different nines, designed by two legends 25 years apart. But the finished product will flow, and this wide-angle framing will really pull the two loops together."

The grass is what connects the two nines. Greens are TifEagle and fairways are Bimini. The unirrigated outer areas are Pensacola Bahiagrass, picked for what Sanford called a "meadow, native-field look." The irrigation designer, The Pignato Group, worked to keep water off the Bahia so it stays dry, open and playable. Darryl Bartlett of NMP told the magazine that the Bahia is being used "almost as a 'Southern fescue'" and that the look is "very different from the typical manicured South Florida golf presentation." All 18 greens are being cored and rebuilt to USGA specifications.

The city's own list of work is longer than the design story. It includes new irrigation and drainage, new cart paths and a crossing, removal of exotic vegetation, new practice facilities, a maintenance facility, and upgraded restrooms and rain shelters. The clubhouse is also being modernized.

Golfers' fees will repay the cost

How the project is paid for shapes what reopening will look like. Boca Magazine reported that the renovation was approved in October 2025 and is funded with a revenue bond repaid from user fees. That structure came out of a consultant's recommendation meant to keep the cost off taxpayers. It followed an earlier public-private partnership proposal that would have traded part of the course land to a developer. Six developers submitted bids, and the commission rejected them after objections from residents and golfers.

So the course was saved without giving up land, and the people who play it will pay for it over time. Sources give different totals. The Post put the project at $27 million at closing. Bobby Jones Links, the firm chosen to run the club, cites $32 million. Boca Magazine's September report says $33 million. For a sense of the demand behind that bet, Bobby Jones Links describes the course as handling nearly 60,000 rounds a year before it closed. Bobby Jones Links also manages the city's Lakeview Golf Club.

The numbers most often repeated for greens fees are proposals, not adopted rates. Boca Magazine reported that under the consultant's plan, 18 holes in peak season, November through April, would cost $80 for residents and $105 for nonresidents. Off-season rates would be $39 and $47. The golf course item on the City Commission's October 13 agenda was a budget amendment, which included $140,000 to replace diseased trees at the course. For regional context, Golf Course Industry notes that at other renovated public courses in the area, The Park in West Palm Beach and North Palm Beach Country Club, golfers compete for tee times priced from $200 to $350.

The resident rate will depend on proving residency, and the city already has a way to do that. Its residency identification card gives discounts at city recreation facilities to people who live within city limits. Eligibility requires valid ID plus proof such as owning and living in a property in the city, a lease of at least six months and one day, or a Declaration of Domicile. Requirements can change, so check that city page for the current list before you go. The club's existing loyalty card and rates pages are from before the renovation and don't reflect the new program.

The reopening date is still unconfirmed

If the late-November estimate holds, the course would reopen right at the start of the November-through-April peak season the proposed rates are built around. The schedule isn't fixed, though, and the official sources don't agree:

  • The city's December 30, 2025 release gave November 2026 for the course, practice facilities and clubhouse.
  • Boca Magazine's September report estimated late November 2026.
  • Golf Course Industry, updated September 30, says "later this year" and notes that the city will decide when public play resumes.
  • The city's renovation site says late fall or early winter.
  • The operator's club profile says early 2027.

No grand-opening event, booking system or new clubhouse restaurant has been announced yet. The city's renovation site is the first place to check for updates.

There's one more date on the calendar. The first city-owned nine opened in 1926, so a reopening before the end of 2026 would fall exactly 100 years later. The south nine will play to Ross's 1925 routing again, and the north nine will play the way Wilson left it in the 1953 photo.

If you live near Highland Avenue and want to know what the reopening could mean for your home, Deborah Puleo can walk you through it. Request a free home valuation or schedule a consultation.

Let's Find Your Next Home

Have questions about buying, selling, or moving to Palm Beach Gardens? Reach out anytime—Deborah is here to help with honest advice and local expertise.